2.08.2014

this weekend I really should start working on creating and adding zippered pillow backs before the pillow fronts start to pile up. yesterday I finished #4:

 
#3 is ready to go:


 
and #2 is assembled:


in the meantime, I have my TV watching project (read into that watching the Olympics) with the Seamless Hybrid I started on Christmas day. I still haven't finished the Urban Aran Cardigan, all that's left is adding the zipper. the two zippers I bought for it were wrong..one is not a separating zipper and both are too long, so I need to go back and get a shorter size.



1 comment:

Calvin said...

Wow, Chris, you really have come a long way with your sewing. Very intricate patterns. I also can't wait to see your finished sweater(s). Great work!

Calvin